Yirranma Place
- Client
- Mainbrace Constructions
- Location
- Darlinghurst, NSW
- Sector
- CommercialStairs/Access
We delivered the structural steel for the new hall, the connecting covered walkway, and the covered outdoor learning area. The package was about 42 tonnes. Key challenges were tight site access between existing buildings and a hard programme date locked to the start of Term 3. ADCO ran a clean site, which made the job straightforward to detail and erect.
